3rd International Conference Offshore Wind Power Substations 2014
Date: | 20-Aug-14 to 22-Aug-14 |
Location: | Swissotel Bremen / Bremen / Germany |
Category: | Conferences & Trade Fairs |
Europe’s leading event for networking and knowledge exchange
- Discover new design approaches and installation concepts in 8 exclusive case studies
- Evaluate installation experience with floating topsides and different foundation concepts
- Reconsider safety aspects and how to integrate them into design and project
management
- Gain insight into O&M requirements and design strategies to reduce service hours
- Get an update on North Sea HVDC projects and far-shore AC connections
Price: €2449
Time: On Wednesday August 20, 2014 at 9:00 am and ends Friday August 22, 2014 at 6:00 pm.
- Discover new design approaches and installation concepts in 8 exclusive case studies
- Evaluate installation experience with floating topsides and different foundation concepts
- Reconsider safety aspects and how to integrate them into design and project
management
- Gain insight into O&M requirements and design strategies to reduce service hours
- Get an update on North Sea HVDC projects and far-shore AC connections
Price: €2449
Time: On Wednesday August 20, 2014 at 9:00 am and ends Friday August 22, 2014 at 6:00 pm.
Visitors
Open to all.
Exhibitors
Alfonso Martinez Caminero Engineering Manager Iberdrola Engineering & Construction, Spain, Martin Russo Head of Substations DONG Energy A/S, Denmark, Matthias Esken Project Manager NSO Offshore Substation RWE Innogy GmbH, Germany, Dr. Lorenz Müller Head of Offshore Projects 50Hertz Transmission GmbH, Germany, Michael Still Grid Connection Manager E.ON Climate & Renewables GmbH, Germany, Adeel Khan Senior Project Engineer Electrical Vattenfall Offshore Wind Power, UK
EIN News
provides powerful, real-time media monitoring, news aggregation & syndication services. Read the latest news about this topic. See: